Drainage solutions for Costco's distribution centre lorry park

Costco’s UK distribution centre

Civil Engineering & Foundations Work for Finnegans, Costco Crick.

Foundation work Commenced on Costco’s main UK distribution centre in February 2015 and were completed in October 2015.
The Projects drainage consisted of approximately 5400m of pipework, varying in size from 150m diameter to 600m diameter and incorporated 66 manholes. The lorry park was drained utilising 1200m of Ultraslot drainage and also 6000m of kerbs were laid. Three petrol interceptors were integrated into the surface system. There were 2300m of service ducts laid and 91 columns erected. A 9000m2 permeable staff car park was constructed, which incorporated over 300m of land drains. All works were completed to budget and programme.